SCHEDULE OPTIMIZER

OPTIMIZE SHORT AND MEDIUM TERM PLANNING

OVERVIEW

MineSight Schedule Optimizer determines the most productive cut mining sequence to achieve the highest project profitability, and then generates practical short to medium term project schedules. This versatile tool satisfies all project quality, quantity, market, and geotechnical constraints, as well as destination capacities, equipment resources, and economic parameters. Advanced integer programming engines are used to solve optimization/blending and scheduling problems.

KEY POINTS

Shovel-level cuts
Semi-automatic material routing
Infeasibility analysis
Advanced engineer controls
Maximize/minimize metal contents
Multiple commercialized optimization engine options (LINDO & CPLEX)

Quality/quantity constraints
Stockpile handling
3D block and stratigraphic model scheduling
Truck/Shovel hour constraints
Maximize net present value (NPV)
Canvas for defining flowsheet

Equipment scheduling
Volume reports
Variable bench heights
Integrated with MineSight Haulage
Advanced Reporting and Charting(ARC) tool
Volume constraints

KEY FEATURES
  • Calculate schedules based on objectives, constraints, and economic parameters
  • Determine optimal cut mining sequence per period
  • Automatically conduct infeasibility analysis to find violating constraints
  • Maximize/minimize net present value (NPV), stripping ratio, or metal contents
  • Utilize available truck and shovel resources efficiently
  • Calculate schedules with or without equipment scheduling option
  • Import cuts from multiple models stored on reliable and secure databases
  • Provide flexible and customized reports and charts for pre- and post-scheduling analysis
  • Provide multiple commercialized optimization engine options (LINDO & CPLEX) to calculate schedules
  • Provide 64-bit package to help solve more complex problems
  • Integrated with MineSight Haulage to define destinations, capacities, opening balances, and calculate cycle time
  • Calculate cut precedence between benches and phases
  • Allow semi-automatic material routing
  • Integrated with cuts designed by MineSight Interactive Planner and MineSight scripts
  • Read data directly from the MineSight Planning Database
  • Generate customized reports and charts filtered by periods, phases, benches, materials, cutoff grade, cut attributes, and/or equipment hours
  • Export customized reports to Microsoft Excel® and CVS
  • Export schedules to MineSight 3D for visualization
  • Integrated with MineSight 3D end-of-period maps
  • Provide advanced notes-taking tool
  • Provide utility tools for archiving and retrieving project
  • Define or Input:
    • Objective per period
    • Materials sent to any number of mills, leaches, pads, stockpiles, and waste dumps
    • Mining, processing, marketing, and geotechnical constraints
    • Stockpile mining and reclaiming constraints as well as reclaiming method
    • Constraints for materials sent to destinations or received from stockpiles
    • Constraints for grade items, grade ratio, and stripping ratio
    • Bench vertical advance rates (VARs)
    • Constraints for shovel and truck hours
    • Advanced engineer constraints such as don't mine/must mine/must completely mine some phases, benches or diglines
    • Tonnage constraints by phase, bench, or diglines
    • Volume constraints by mining area, phase, bench, or destination
    • Destination tonnage/volume capacity constraints
    • Physical relationships between phases
    • Material movements by mining area and by phase
    • Equipment usages by mining area and by phase