MineSight for Long Term Planning

This course is intended for the intermediate to advanced user of MineSight who is charged with long term planning. The course examines the MineSight tools available for pit optimization, pit design, and life-of-mine scheduling. These tasks are accomplished using MineSight 3D, MineSight Compass, MineSight Economic Planner, and MineSight Strategic Planner.

Prerequisites:
Topics:
  • Pit Optimization
  • Evaluation of sensitivities in design parameters.
  • Pit design
  • Commodity price sensitivity analysis
  • Phase sequencing
  • Preliminary scheduling
  • Reserve reporting tools
  • Life-of-mine schedules
  • End-of-Period maps
Details:
  • 5 days
Tucson, AZ
  • August 16-20, 2010
  • September 27-October 1, 2010
  • November 8-12, 2010
Santiago, Chile
  • Septiembre 6-10, 2010
  • Diciembre 13-17, 2010
Lima, Perú
  • Noviembre 22-26, 2010
Johannesburg, South Africa
  • none scheduled